📁 BGI Sprint I has ended — Resilience is archived and read-only · Files are downloadable until Jul 28, 2026
OverviewSubmissions

Resilience Archived · BGI Sprint I

1 member · Jun 1 → Jun 28, 2026

SPRINT RESULT

"OmegaClaw must not repeat the Bonfires AI failure mode: an inefficient stack, centralized infrastructure dependency, and total loss of usefulness after data center strikes or internet shutdowns. The project must be redirected toward a Rust native, low resource, highly assured, peer to peer architecture capable of running on 512 MB RAM hardware and remaining operational during global infrastructure disruption. Its secondary purpose is to serve the Integral Collective parallel economy project as resilient coordination infrastructure. Its communication model must also reject text slop entirely, replacing generic prose generation with post text communication." — no submission

Status: Submitted

Roster (read-only)

bohushvitali · Captain · Project OwnerView profile

Profiles stay visible — reconnect with teammates on the next sprint.